Islam Abad (Kermanshah West Bypass), Province of Kermanshah, Iran

26 Km 4-Lane Highway with 3.65 width each

Two interchange bridges with the spans of 42m and 4×20m and two river bridges with the spans of 3×20m and 2×20m of I Shaped Steel Girders and RC Girders

Total Length of the Bridges 222m

Client

Construction and Development of Transportation Infrastructures Co.

Date of Completion

2020

Services Delivered

Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of the Construction