Dezful Fourth Bridge over the Dez Perennial River, Province of Khoozestan, Iran

- Spans of the Main Bridge: 45+3×70+45m of In-Situ Balanced Cantilever Pre-stressed Concrete Single Cell Box Girder
- Spans of the Access Bridges: 2×31.5m and 11×31.5m of Precast Pre-stressed Concrete Beam and in-situ Slab
- Total Length of the Bridge around 700m

Client
Ministry of Road and Transportation

Date of Completion
2008

Services Delivered
Preliminary and Detailed Design of the Alignment and the Bridge/ Supervision of the Construction