Mashhad-Sarakhs railway

Mashhad-Sarakhs-2

Project: Construction of Mashhad-Sarakhs railway (Lots 4 and 5)
Client: Executive department of construction and Development of national railway network
Hexa’s Responsibilities: Design & Supervision
Length of project: 17 km
Structure Type: Tunnel in rock and soil with considerable 
over burden
Important Structure: Consists of 15 great bridges and 6 km tunnel as apart of 17 km railway
Construction Method: Traditional tunneling method consisting of explosive excavation, temporary rock bolt supports and final cast-in-situ RC lining
Date of Completion: 1997