Sebalootak Cable-Stayed Bridge

3Balootak-Model
3Balootak-2
3Balootak

Project: Construction of a cable stayed bridge over the Karun river in Ahwaz
Client: Iran Water and Power Resources Development Co.
Hexa’s Responsibilities: Design & Supervision 
Structural Type: Cable stayed bridge
Main Span: 260 m
Project's Construction Situation: Being constructed
Description: The longest span for cable-stayed bridge in Iran

2018 Hexa Co All rights reserved.