Arched bridge Karun IV

Project: Construction of a truss arch bridge over the Karun River
Client: Iran Water and Power Resources Development Co.
Hexa’s Responsibilities: Design check of bridge and supervision on construction
Structural Type: Truss arch bridge with deck over the arch constructed by cantilever method
Span Orientation: 300 m
Date of Completion: 2012
2018 Hexa Co All rights reserved.