Ahwaz Urban Railway - Line 1

Project: 1st line of Ahwaz urban railway using mechanized technology of EPB/Slurry TBM
Client: Ahwaz Urban Railway Organization
Hexa’s Responsibilities: Geotechnical and structural consultancy of underground TBM logistic entrance ramp and launching shaft, 24 stations and 7 crossovers for the EPC contractor
Construction Method: Different and combined designs and monitored practices of Cut & Cover and Top-Down methods in difficult geotechnical conditions beneath the water table in permeable strata
Project's Construction Situation: Being constructed