Shiraz Urban Railway - Line 1

Project: Lots 6 and 7 of Shiraz urban railway
Client: Shiraz Urban Railway Organization
Hexa’s Responsibilities: Design & Supervision
Structure Type: Shallow urban box tunnel
Construction Method: 
 • Top-Down using both precast
 • Cast-in-situ elements
 • NATM                                                                        
Project: Lots A , B and D of Shiraz urban railway (8 km)
Client: Shiraz Urban Railway Organization
Hexa’s Responsibilities: Design & Supervision
Structure Type: Shallow urban box tunnel
Construction Method: Top-Down using precast elements
2018 Hexa Co All rights reserved.