Bafq-Bandar Abbas Railway

Project: Construction of 50 km of double track railway and all associated structures
Client: Ministry of Road and Transportation
Hexa’s Responsibilities:
 1- Design and substructure and design check of two major bridges
2- Supervision of construction of the railway
Length of Project: 50 km
Structural System of the Bridge: Steel truss 
Span Orientation: 60+3×80+60 m , 60+4×80+60 m
Date of Completion: 1994

 