Karun I Bridge

Project: Construction of a bridge crossing over the river Karun for access to the power station of Abbaspoor dam
Client: Iran Water and Power Resources Development Co.
Hexa's Responsibilities: Design of the bridge in terms of an EPC contract
Structural Type: Cast-in-situ pre-stressed concrete box girder built by balanced cantilever method
Span Orientation: 45+100+45 m
Date of Completion: 2005
2018 Hexa Co All rights reserved.