Sevom Khordad Bridge (Darquain)

Project: Construction of bridge over river Karun in Darquain oil field
Client: Ministry of Road and Transportation
Hexa's Responsibilities: Design and supervision in consortium and in terms of an EPC contract
Structural Type: Cast-in-situ pre-stressed concrete box girder built by balanced cantilever method
Span Orientation: 30+30+60+120+60 m
Date of Completion: 2005
2018 Hexa Co All rights reserved.