Goutvand Bridge

Project: Construction of a bridge over the river Karun in Ahwaz
Client: Iran Water and Power Resources Development Co.
Hexa's Responsibilities: Design & Supervision
Structural Type: Cast-in-situ pre-stressed concrete box girder built by balanced cantilever method 
Span Orientation: 67.5+125+67.5 m
Date of Completion: 2009
2018 Hexa Co All rights reserved.