Sadr Highway Bridge

Project: Construction of Sadr elevated expressway in Tehran
Client: Municipality of Tehran
Hexa’s Responsibilities: Design & Construction Supervision
Structural Type: Precast pre-stressed concrete box girder and steel box girder for some ramps
Construction Method: The segmental bridge ramps will be precast pre-stressed balanced cantilever and main bridge erected with parallel launching gantry infill practice
Length of Bridge: 6 km
Date of Completion: 2013