8th Ahwaz Bridge

The Second longest main span in Iran 
Project: Construction of a bridge over the river Karun in Ahwaz
Client: Municipality of Ahwaz
Hexa's Responsibilities: Design & Supervision 
Structural Type: Cable-stayed Bridge consisting of pile-group foundation system, A-frame pier & pylons and composite deck consisting of steel box girder beams and RC slab spanning 212m in the middle
Spans Orientation: 6×25+78+212+78+5×25 m
Main Span Orientation: 212 m
Date of Completion: 2011