Converting level crossings of existing railway network to interchanges

Project: Converting level crossings of existing railway network to interchanges
Client: Islamic Republic of Iran Railways
Hexa’s Responsibilities: Consultant of the Client
Project's Construction Situation: Up to 20 interchanges being constructed

 

 

 

2018 Hexa Co All rights reserved.