Mianeh-Bostanabad-Tabriz Railway

Project: Mianeh - Bostan Abad - Tabriz railway,  Lots 2 and 3
Client: Ministry of Roads and Urban Development
Hexa’s Responsibilities: Design & Supervision
Length of project: 37 km
Important Structure: Consists of 8 great bridges and 2 tunnels
Structural Type: Reinforced concrete piers constructed by sliding formwork, double steel box girders with RC slab constructed by state-of-the-art incremental launching
Project's Construction situation: Being constructed

2018 Hexa Co All rights reserved.